Communications Projects

Project: The Phoenix Building
Location:

1600 Arch Street
Phila. PA

 

Architect: Bower Lewis Thrower
Date of Completion: August 2002

Provided a certified Siemon Cabling System with over (1800) Category 5e and RG6 coax cables installed throughout the luxury apartment building. Installed copper voice backbone and coaxial backbone for CATV to (36) telecommunication closets.


Project: American Infrastructure
Location: 1805 Berks Road
Worcester, PA
Date of Completion: Nov 2003

Installed over (400) Category 6e cables with inside and OSP fiber optic and copper backbone, assisted in server room design and construction.


Project: Swarthmore College Science Center Renovation
Location:

Swarthmore College

Architect: Helfand Myerberg Guggenheimer
Date of Completion: In progress, due mid 2004

Installed certified Siemon Cabling System solution consisting of over (2800) Category 6e cables, OSP and indoor copper and fiber backbones throughout multiple floors in a multi-building campus.


Project: Duane Morris, LLC
Location:

Liberty Place 1,
Phila. PA

 

Architect: Bower Lewis Thrower
Date of Completion: Oct 2003

Installed over (700) Category 5e & 6e cables in Center City Philadelphia high rise office.

For a complete list of projects please contact us.